<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Road-Closure on WACN 21 News</title><link>https://wacn21-news-1a92c2.pages.catalystgroup.tech/tags/road-closure/</link><description>Recent content in Road-Closure on WACN 21 News</description><generator>Hugo</generator><language>en-us</language><copyright>© 2026 WACN 21 News. All rights reserved.</copyright><lastBuildDate>Mon, 10 Aug 2026 01:10:00 -0400</lastBuildDate><atom:link href="https://wacn21-news-1a92c2.pages.catalystgroup.tech/tags/road-closure/index.xml" rel="self" type="application/rss+xml"/><item><title>I-285 weekend closure between South Atlanta and Paces Ferry reopens early, GDOT says</title><link>https://wacn21-news-1a92c2.pages.catalystgroup.tech/local/i-285-weekend-closure-ends-early-aug-10-2026/</link><pubDate>Mon, 10 Aug 2026 01:10:00 -0400</pubDate><guid>https://wacn21-news-1a92c2.pages.catalystgroup.tech/local/i-285-weekend-closure-ends-early-aug-10-2026/</guid><description>&lt;p&gt;ATLANTA — Monday’s Perimeter commute just got a little less hostile than the weekend work zone promised.&lt;/p&gt;
&lt;p&gt;Atlanta News First reported that the Georgia Department of Transportation reopened the stretch of &lt;strong&gt;I-285&lt;/strong&gt; closed for construction this weekend &lt;strong&gt;earlier than scheduled&lt;/strong&gt;. Crews had shut &lt;strong&gt;all lanes in both directions&lt;/strong&gt; between &lt;strong&gt;South Atlanta Road and Paces Ferry Road&lt;/strong&gt;. The closure window had been set to run through &lt;strong&gt;5 a.m. Monday&lt;/strong&gt;; the roadway reopened &lt;strong&gt;Sunday night&lt;/strong&gt; instead.&lt;/p&gt;</description></item></channel></rss>